Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Awnings - Blinds - Curtains Installation SWMS 10147-5

Awnings - Blinds - Curtains Installation SWMS 10147-5

Product SKU: 10147
Awnings - Blinds - Curtains Installation SWMS 10147-5 Video

Other Details

PDF Download:
awnings_blinds_curtain_installation_swms_10147-5__SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Awnings - Blinds - Curtains Installation Safe Work Method Statement (SWMS)

This SWMS covers general issues associated with installation of window accessories such as awnings, blinds and curtains – both exterior and interior works. This SWMS includes installation works on construction sites and existing domestic dwellings.  

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.  

Awnings - Blinds - Curtains Installation SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant
    • Involves a risk of a person falling more than 2m, including work on telecommunication towers
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)  
    1. Planning & Preparation
    2. Training & Capabilities
    3. Assess on site conditions
    4. Work area set up
    5. Install mounting brackets/hard ware
    6. Mounting canopy/blind/rod/curtain and cords/chains
    7. On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

 

swmsformats.png

app-store-badge.png       google-play-badge.png

 

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...