Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Balustrade/Handrail Installation SWMS 10008-4

Balustrade/Handrail Installation SWMS 10008-4

Product SKU: 10008
Balustrade/Handrail Installation SWMS 10008-4 Video

Other Details

PDF Download:
balustrade_-_handrail_installation_swms_10008-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Download via Email on order completion.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Instructions on customisation provided.
    • Complies with current legislation in all Australian States/Territories and New Zealand.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Balustrade/Handrail Installation SWMS | Safe Work Method Statement

This Balustrade/Handrail Installation Safe Work Method Statement (SWMS) provides guidance on safe installation of balustrades and handrails.

Included in this SWMS is planning and preparation, training and competency requirements, working at heights and falling objects.

Job Steps covered in Balustrade/Handrail Installation SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Arrival & Site Assessment
  4. Work Area Set-up
  5. Installing Fittings, Balustrade and Rails
  6. On Completion
  7. Record Keeping/Health Monitoring

jsa-iauditor.png

We're here to help if you need us!

We give you support just call 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...