Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Balustrade - Handrail Installation SWMS 10008-3

Balustrade - Handrail Installation SWMS 10008-3

Product SKU: 10008
Balustrade - Handrail Installation SWMS 10008-3 Video

Other Details

PDF Download:
Balustrade - Handrail Installation SWMS 10008-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • Fully customisable so you can add your logo and any site specific details
  • Customising Instructions provided
  • You must have Microsoft Word or iAuditor to use this template

Balustrade - Handrail Installation Safe Work Method Statement

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with working with safe installation of balustrades and handrails. Included in this SWMS is planning and preparation, training and competency requirements, working at heights and falling objects.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Balustrade - Handrail Installation SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Involves a risk of a person falling more than 2m, including work on telecommunications towers
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Arrival & site assessment
    • Work area set up
    • Installing fittings, balustrade and rails
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...