Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Balustrade - Handrail Installation SWMS 10008-4

Balustrade - Handrail Installation SWMS 10008-4

Product SKU: 10008
Balustrade - Handrail Installation SWMS 10008-4 Video

Other Details

PDF Download:
balustrade_-_handrail_installation_swms_10008-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Balustrade - Handrail Installation Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) provides guidance on safe installation of balustrades and handrails. Included in this SWMS is planning and preparation, training and competency requirements, working at heights and falling objects.

Job Steps Covered in Balustrade - Handrail Installation SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival & site assessment
  4. Work area set up
  5. Installing fittings, balustrade and rails
  6. On Completion
  7. Record Keeping/ Health Monitoring

godigital-digitaljsa-bannerforswmspages-v3.png
 
Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...