Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Bark Blower Truck Operation SWMS 10

Bark Blower Truck Operation SWMS 10

Product SKU: 10018
Bark Blower Truck Operation SWMS 10 Video

Other Details

PDF Download:
MobilePlant_bark_blower_truck_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • This SWMS includes a Bark Blower Truck Pre-Start Checklsit
  • Delivered via email for instant download
  • You must have Microsoft Word to use this template (SWMS Template for use with iAuditor coming soon)

Bark Blower Truck Operation Safe Work Method Statement

This Safe Work Method Statement (SWMS) comes pre-filled and outlines the safety steps, general hazards and controls associated with Bark Blower Trucks used for dispersing bark/mulch products.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Bark Blower Truck Operation SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Pre start check
    • Loading product into truck
    • Travel to / between sites
    • Assess onsite conditions
    • Prepare intended work site
    • Bark blower operation
    • Refuelling
    • On Completion
  • Truck Roll-Over Emergency Response
  • Bark Blower Truck Pre-Start Checklist
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...