Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Benchtop Installation (Stone - Concrete) SWMS 10257-6

Benchtop Installation (Stone - Concrete) SWMS 10257-6

Product SKU: 10257
Benchtop Installation (Stone - Concrete) SWMS 10257-6 Video

Other Details

PDF Download:
Benchtop Installation (stone-concrete) SWMS 10257-6_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Benchtop Installation - Stone - Concrete Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the installation of pre-fabricated stone (such as granite and reconstituted stone materials) and concrete countertops/benchtops. This does not include the manufacture, cutting and polishing of the material. This SWMS includes installation works on construction sites and existing premises, both domestic and commercial.  

Job Steps Covered in Benchtop Installation - Stone - Concrete SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival & Site Assessment
  4. Work Area Set Up
  5. Transfer of stone to work area & installation
  6. Cutting and grinding stone
  7. Fixing the benchtop to cabinets
  8. On Completion

Click here to view a sample of the Benchtop Installation - Stone - Concrete SWMS


We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...