Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Bio-medical Engineering Repairs (Optical) SWMS 10462-1

Bio-medical Engineering Repairs (Optical) SWMS 10462-1

Product SKU: 10462
Bio-medical Engineering Repairs (Optical) SWMS 10462-1 Video

Other Details

PDF Download:
Bio-medical Engineering Repairs (optical) SWMS10462-1_SAMPLE .pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Bio-medical Engineering Repairs (Optical) Safe Work Method Statement Scope:

This SWMS covers the hazards associated with routine field and in-house servicing and repairs to a wide range of microscopes at sites such as labs, schools, colleges, universities, research organisations, operating theatres etc.

Job Steps Covered in Bio-medical Engineering Repairs (Optical) SWMS:

(includes potential hazards and control measures)

  1. Planning, preparation & site assessment 
  2. Arrival at site 
  3. Set up work area with equipment
  4. On Completion
  5. Record Keeping/ Health Monitoring

Click here to view a sample of the Bio-medical Engineering Repairs (Optical) SWMS 

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...