Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Bollard/Speed Bump Installation SWMS 10478-1

Bollard/Speed Bump Installation SWMS 10478-1

Product SKU: 10478
Bollard/Speed Bump Installation SWMS 10478-1 Video

Other Details

PDF Download:
Bollard-Speed Bump Installation SWMS 10478-1_SAMPLE .pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Download via Email on order completion.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Instructions on customisation provided.
    • Complies with current legislation in all Australian States/Territories and New Zealand.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Bollard/Speed Bump Installation SWMS | Safe Work Method Statement

This Bollard/Speed Bump Installation Safe Work Method Statement (SWMS) outlines general hazards for installing bollards and speed bumps to un/controlled crossings, pedestrian islands/pathways, vehicle crossovers, railway platforms, car parks etc.

The method covered in this SWMS is drilling and bolting bollard/speed bump onto asphalt or concrete.

Job Steps covered in Bollard/Speed Bump Installation SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Arrival & Assess On-site Conditions
  3. Work Area Set-up
  4. Marking Out & Installing Bollard/Speed Bump
  5. Refuelling Small Engines On-site
  6. On Completion

jsa-iauditor.png

We're here to help if you need us!

We give you support just call 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...