Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Bollard-Speed Bump Installation SWMS 10478-1

Bollard-Speed Bump Installation SWMS 10478-1

Product SKU: 10478
Bollard-Speed Bump Installation SWMS 10478-1 Video

Other Details

PDF Download:
Bollard-Speed Bump Installation SWMS 10478-1_SAMPLE .pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Bollard-Speed Bump Installation Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) involves general hazards for installing bollards and speed bumps to un/controlled crossings, pedestrian islands/pathways, vehicle crossovers, railway platforms, car parks etc. The method covered in this SWMS is drilling and bolting bollard/speed bump onto asphalt or concrete.

Job Steps Covered in Bollard-Speed Bump Installation SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Arrival & Assess Onsite Conditions
  3. Work Area Set Up
  4. Marking Out & Installing Bollard/Speed Bump
  5. Refueling Small Engines On Site
  6. On Completion

godigital-digitaljsa-bannerforswmspages-v3.png

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...