Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Brick - Block Laying SWMS 10033-7

Brick - Block Laying SWMS 10033-7

Product SKU: 10033
Brick - Block Laying SWMS 10033-7 Video

Other Details

PDF Download:
Brick - Block Laying SWMS 10033-7_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • A Logo can easily be added
  • Add or Delete information 
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Brick - Block Laying Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) covers general hazards associated with laying bricks and blocks.  Included in this SMWS also is controls for the use of a brick elevator, exposure to Respirable Crystalline Silica (RCS) dust, storage and material management and height access equipment.

Job Steps Covered in Brick - Block Laying SWMS:

  1. (includes potential hazards and control measures)
  2. Planning and Preparation
  3. Training and Capabilities
  4. Arrival at site
  5. Materials delivery
  6. Work area set up
  7. Mixing and transporting mortar
  8. Cutting bricks
  9. Brick elevator setup
  10.  Loading scaffold/trestle with Bricks/Blocks

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...