Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

A person using a pressure cleaner to clean a brick wall

Brick Cleaning Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Brick Cleaning Safe Work Method Statement

This Brick Cleaning Safe Work Method Statement covers hazards and controls associated with cleaning brickwork using a petrol-operated high-pressure cleaner, using cold water and hydrochloric acid/water solution.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Brick Cleaning SWMS:

(includes potential hazards & control measures).

  1. Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
  2. Working Outdoors
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Working at Height on Ladders, Trestles, Mobile Scaffold, Fixed Scaffold & Openings
  9. Mix Acid Solution
  10. Cleaning Bricks
  11. Fuelling On-site
  12. On Completion
  13. Emergency Response

 

We've recently reviewed and updated our silica dust controls in line with the new 2023 Code of Practice for Silica Dust hazards in the construction industry. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Brick Cleaning Safe Work Method Statement

This Brick Cleaning Safe Work Method Statement covers hazards and controls associated with cleaning brickwork using a petrol-operated high-pressure cleaner, using cold water and hydrochloric acid/water solution.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Brick Cleaning SWMS:

(includes potential hazards & control measures).

  1. Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
  2. Working Outdoors
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Working at Height on Ladders, Trestles, Mobile Scaffold, Fixed Scaffold & Openings
  9. Mix Acid Solution
  10. Cleaning Bricks
  11. Fuelling On-site
  12. On Completion
  13. Emergency Response

 

We've recently reviewed and updated our silica dust controls in line with the new 2023 Code of Practice for Silica Dust hazards in the construction industry. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View