Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Cabinet (Commercial - Domestic) Installation SWMS 10038-7

Cabinet (Commercial - Domestic) Installation SWMS 10038-7

Product SKU: 10038
Cabinet (Commercial - Domestic) Installation SWMS 10038-7 Video

Other Details

PDF Download:
cabinet_commercial_-_domestic_installation_swms_10038-6_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Cabinet (Commercial - Domestic) Installation Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) covers installation of cabinets (wood, laminate and stainless steel) in kitchens, bathrooms, laundries, bedrooms, shops and offices. This SWMS includes installation works on construction sites and existing premises, both domestic and commercial.

Job Steps Covered in Cabinet (Commercial - Domestic) Installation SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival onsite
  4. Assess onsite conditions
  5. Work area set up
  6. Hanging upper cabinets & installing the lower cabinets
  7. Install bench tops & sink
  8. Install cabinets doors & hardware
  9. Using power tools
  10. Remote and/or isolated work
  11. On Completion
  12. Record Keeping/Health Monitoring

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...