Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Carpentry (Raised Timber Floor) SWMS 10484-1

Carpentry (Raised Timber Floor) SWMS 10484-1

Product SKU: 10484
Carpentry (Raised Timber Floor) SWMS 10484-1 Video

Other Details

PDF Download:
Carpentry (raised timber floor) 10484-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Carpentry (Raised Timber Floor) Safe Work Method Statement Scope:

This SWMS covers the general hazards for installing a raised timer floor on a concrete substrate. The method covered in this SWMS is fixing structural timber battens and sheeting using explosive power tools, hammer drills and a compressor.

Job Steps Cover in Carpentry (Raised Timber Floor) SWMS:

(includes potential hazards and control measures)

  1. Arrival at site 
  2. Materials Delivery & work area set up
  3. Fixing battens to concrete substrate
  4. Laying structural floor sheeting
  5. On completion
  6. Record Keeping/Health Monitoring

godigital-digitaljsa-bannerforswmspages-v3.png

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...