Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Ceiling Panel and Insulation Installation (From EWP) SWMS 10642-1

Ceiling Panel and Insulation Installation (From EWP) SWMS 10642-1

Product SKU: 10642
Ceiling Panel and Insulation Installation (From EWP) SWMS 10642-1 Video

Other Details

PDF Download:
Ceiling Panel and Insulation Installation (from EWP) 10642-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Ceiling Panel and Insulation Installation (From EWP) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the use of an Elevating Work Platform (EWP) to install ceiling panels and insulation. Included in this SWMS is the planning and preparation, training, prestart and operational controls associated with the task. This SWMS also includes a ‘Falls Emergency Rescue Plan’.

Job Steps Covered in Ceiling Panel and Insulation Installation (From EWP) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Implement a Falls Emergency Rescue Plan
  4. Delivery and removal of EWP
  5. Assess onsite conditions
  6. Working near utilities
  7. Work area set up
  8. EWP Pre-start check
  9. Placement of panels and insulation
  10. On Completion
  11. Refuelling on site


godigital-digitaljsa-bannerforswmspages-v3.png
 

 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...