Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Chainsaw SWMS 10

Chainsaw SWMS 10

Product SKU: 10046
Chainsaw SWMS 10 Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Chainsaw Safe Work Method Statement

This 14-page Safe Work Method Statement (SWMS) is pre-filled with the safety steps, general hazards and controls associated with operation of petrol, handheld chainsaw.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Jackhammer SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Work area set up
    • Operating the chainsaw
    • Working with hazardous materials
    • Refuelling on site
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

 

iat-word-files.jpg

app-store-badge.png google-play-badge.png

This SWMS includes: 

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Easy customisation with MS Word format (NOT PDF)
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks

Related Items:

 

Write your own product review

Product Reviews


  1. Praise for Safe Work Statement.

    Posted by on

    I am using the Chain saw Tree felling and the Heat stress SWMS & find them of good, well written by experts in the field, with not much left to add,
    ood work.safety Culture.


$79.95

PLUS GST

View Cart


You May Also Need...