Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Chasing Concrete SWMS 10548-4

Chasing Concrete SWMS 10548-4

Product SKU: 10548
Chasing Concrete SWMS 10548-4 Video

Other Details

PDF Download:
Concrete Chasing SWMS 10548-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
 
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Chasing Concrete Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the general use of a hand held, electric or petrol/diesel power tools for chasing channels for conduit. This includes planning and preparation, environmental controls, working adjacent to mobile plant, training and communications, operational controls and exposure to Respirable Crystalline Silica (RCS) dust 

Job Steps Covered in Chasing Concrete SWMS:

(includes potential hazards and control measures)

  • Planning & Preparation
  • Training and Capabilities
  • Assess Onsite Conditions
  • Work Area Set Up
  • Chasing
  • On Completion

Click here to view a sample of the Chasing Concrete SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...