Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Christmas Decoration Installation SWMS

Christmas Decoration Installation SWMS

Product SKU: 10463
Christmas Decoration Installation SWMS Video

Other Details

PDF Download:
XMS_DECORATION_INSTALLATION_SWMS_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Detailed document to identify risks and hazards involved with installing Christmas decorations
  • Suitable for a range of venues - customize to suit the job
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections

The Christmas Decoration Installation SWMS Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with the installation and dismantling of Christmas Decorations in places such as shopping centres. 

This SWMS covers risks associated with installation of Christmas decorations (including tree, lights, tinsel, baubles etc.) at shopping centres and other relevant venues. Ensure the manufacturer’s installation manual/guide is available for specific information on all installation works.

Item information:

  • Employee sign off section so you can demonstrate the training and competency of your workers
  • Relevant legislation helping you with compliance
  • Review section to assist you in ensuring controls are implemented and monitored effectively
  • Detailed step through of the activity/task saving you time

SWMS content: 

  • PPE
  • Safety Notes
  • Arrival On Site
  • Pre - Start Inspection
  • Installation / Erecting of Decoration
  • Pack Up / Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks
Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...