Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Cladding Removal and Replacement (Rope Access) SWMS 10476-1

Cladding Removal and Replacement (Rope Access) SWMS 10476-1

Product SKU: 10476
Cladding Removal and Replacement (Rope Access) SWMS 10476-1 Video

Other Details

PDF Download:
Cladding Removal and Replacement (rope access) SWMS 10476-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Cladding Removal and Replacement (Rope Access) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) involves the removal of combustible cladding and cladding replacement using rope system. Includes a Falls Emergency Rescue Plan.

Job Steps Covered in Cladding Removal and Replacement (Rope Access) SWMS:

(includes potential hazards and control measures)

  1. Develop rigging plan & falls emergency rescue plan
    • Emergency Response Procedure included in SWMS
  2. Establish on-site systems
  3. Arrival & assess onsite conditions
  4. Materials & waste delivery & removal
  5. Test anchor points
  6. Pre -operational inspection
  7. Removing & replacing cladding using rope system
  8. Dismantling rope access system
  9. On completion

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...