Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Cleaning (Final Building Clean Before Handover to Client) SWMS 10037-6

Cleaning (Final Building Clean Before Handover to Client) SWMS 10037-6

Product SKU: 10037
Cleaning (Final Building Clean Before Handover to Client) SWMS 10037-6 Video

Other Details

PDF Download:
cleaning_final_building_clean_before_handover_to_client_swms_10037-6_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Building Clean - Final clean before handover to client Safe Work Method Statement

This SWMS covers the cleaning of a residential or commercial building at the end of construction before final hand-over to client. Covering the potential job steps, hazards and control measures associated with final building cleans, this comprehensive document is available for instant download.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.  

Building Clean - Final clean before handover to client SWMS Content: 

  • High Risk Construction Work
    • Mobile
    • Involves a risk of a person falling more than 2m, including work on telecommunications towers
    • Work carried out adjacent to a road, railway or shipping lane, and traffic corridor.    

  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training & Capabilities
    • Assess onsite conditions
    • Work area setup
    • Internal building clean inc. floors, windows, wet areas and fittings
    • External building cleaning inc. paths windows, driveway etc
    • Using power tools such as vacuum cleaners, pressure cleaner etc
    • Working at elevated positions
    • On completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

 

swmsformats.png

app-store-badge.png       google-play-badge.png

 

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...