Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Cleaning (Flood - Storm) SWMS 10107-6

Cleaning (Flood - Storm) SWMS 10107-6

Product SKU: 10107
Cleaning (Flood - Storm) SWMS 10107-6 Video

Other Details

PDF Download:
Cleaning (flood-storm) SWMS 10107-6_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Flood & Storm Clean Up Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) covers clean-up of premises after floods or storm event, including removal of contaminated items and building materials. This SWMS covers the following hazards - asbestos, ladder use, biological hazards for humans, animals and the environment include: Contaminated waste, contaminated water and mud, dead animals etc. as floodwaters recede. 

Job Steps covered in Flood & Storm Clean Up SWMS: 

(includes potential hazards and control measures)

  1. Site preparation
  2. Arrival & assess onsite conditions
  3. Work area set up
  4. Removal of furniture, household items including fitted cabinets, mud & floor covering (vinyl, linoleum, carpet)
  5. Insulation removal
  6. Clean and disinfect every surface
  7. Waste management 
  8. On completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


  1. Very Happy

    Posted by on

    We recently had major flooding and this SWMS was invaluable thanks to Safety Culture for getting it out to us when we needed it.


  2. Amazing

    Posted by on

    I run a restaurant and have recently had a lot of problems with flooding. This SWMS lets us safely clean up and get back on our feet as soon as possible. It's a hard life but that's what you have to live with if you want to be the best Sushi chef in Atlantis. Also this website is amazing! Thanks for a job well done to the awesome guy who works on it!


$79.95

PLUS GST

View Cart


You May Also Need...