Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Cleaning (Hard Floors) SWMS 10607-1

Cleaning (Hard Floors) SWMS 10607-1

Product SKU: 10607
Cleaning (Hard Floors) SWMS 10607-1 Video

Other Details

PDF Download:
cleaning_hard_floors_swms_10607-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Cleaning – Hard Floors Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the task of cleaning hard floors, such as vinyl, stone or tile etc., at commercial premises and private residences. The methods of cleaning covered in this SWMS are manual (cleaning without a powered machine), ride-on and push model scrubbers.   

Job Steps Covered in Cleaning – Hard Floors SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Transporting equipment
  4. Assess intended cleaning site
  5. Set up work area with equipment
  6. Manual cleaning
  7. Working with scrubber
  8. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...