Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Cleaning (Meth Lab) SWMS 10633-1

Cleaning (Meth Lab) SWMS 10633-1

Product SKU: 10633
Cleaning (Meth Lab) SWMS 10633-1 Video

Other Details

PDF Download:
Cleaning (meth lab) SWMS 10633-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Cleaning (Meth Lab) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) deals with general hazards associated with cleaning an area in which a Clandestine Drug Lab was located. Included in this SWMS is planning and preparation, training, contact with aggressive persons and general duties associated with the task.  

Job Steps Covered in Cleaning (Meth Lab) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival at site
  4. Site set-up
  5. Site clean up
  6. Handling and disposing of contaminated waste
  7. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...