Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Cleaning (Windows) SWMS 10303-5

Cleaning (Windows) SWMS 10303-5

Product SKU: 10303
Cleaning (Windows) SWMS 10303-5 Video

Other Details

PDF Download:
cleaning_windows_swms_10303-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Cleaning (Windows) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards and controls associated with general window cleaning tasks using water fed extension poles and ladders. 

This SWMS does not cover the use of Elevated Work Platforms, working on scaffolding or the use of rope access equipment. If using these items a separate dedicated SWMS will need to be in place and used

Job Steps Covered in Cleaning (Windows) SWMS:

(includes potential hazards and control measures) 

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Work area set up
  5. Internal window cleaning
  6. External window cleaning
  7. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


  1. Easy to use

    Posted by on

    This has been such a time saver for me, so easy to understand!


$79.95

PLUS GST

View Cart


You May Also Need...