Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Communications - Cable Hauling SWMS 10

Communications - Cable Hauling SWMS 10

Product SKU: 10382
Communications - Cable Hauling SWMS 10 Video

Other Details

PDF Download:
Communications_Cable_Hauling_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or SafetyCulture iAuditor to use this template

Communications - Cable Hauling Safe Work Method Statement

This Safe Work Method Statement (SWMS) is pre-filled with general safety steps, hazards and controls associated with cable hauling. This SWMS covers the planning, preparation and operation involved with hauling cable adjacent to roads and, working in a pit or manhole. Work carried out near or in a Confined Space is defined as a High Risk Activity under s291 of the Work Health and Safety Regulations 2011. 

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.  

Communications - Cable Hauling SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor
    • Tilt-up pre pre-cast concrete
    • Work in an area that may have a contaminated or flammable atmosphere
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Travel to/from sites
    • Assess onsite conditions
    • Work area set up
    • Loading / unloading equipment and materials from vehicle
    • Access manhole / pit
    • Blowing rope/rods
    • Pulling cable
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...