Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Communications (Fibre Optic Splicing) SWMS 10369-4

Communications (Fibre Optic Splicing) SWMS 10369-4

Product SKU: 10369
Communications (Fibre Optic Splicing) SWMS 10369-4 Video

Other Details

PDF Download:
communications_fibre_optic_splicing_swms_10369-4__83186_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Communications - Fibre Optic Splicing Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) provides guidance on Fibre Optic cable splicing/joining. This SWMS covers the planning and preparation of the activity and operation involved with repairing, splicing or building a new joint in fibre optic cabling adjacent to roads and, subsequent placement in a pit or manhole.

Job Steps Covered in Communications - Fibre Optic Splicing SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Travel to/from sites
  4. Assess onsite conditions
  5. Work area set up
  6. Access manhole / pit
  7. Drilling bracket mounts in pit (Power drill & generator)
  8. Fibre splicing joint
  9. Testing & Commissioning
  10. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...