Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604
20% OFF ALL SWMS & SOPS!!!! Ends 5pm 31st July 2017. Enter coupon SAVE20% at checkout.

Communications - Fibre Optic - Termination SWMS 10

Communications - Fibre Optic - Termination SWMS 10

Product SKU: 10370
Communications - Fibre Optic - Termination SWMS 10 Video

Other Details

PDF Download:
Communications_fibre_optic_termination_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Communications - Fibre Optic - Termination Safe Work Method Statement

This Safe Work Method Statement (SWMS) provides guidance on Fibre Optic cable run in and termination. This SWMS covers the planning, preparation and operation and emergency procedures involved with running fibre optic cable into premises and terminating at a wall cabinet.Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Communications - Fibre Optic - Termination SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor
    • Work in an area that may have a contaminated or flammable atmosphere
    • Tilt up or pre-cast concrete
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Travel to/from sites
    • Assess onsite conditions
    • Work area set up
    • Running cables/leads (ceiling spaces and walls)
    • Attaching wall cabinets
    • Cable termination
    • Testing & Commissioning
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...