Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Communications (Fibre Optic Termination) SWMS 10370-4

Communications (Fibre Optic Termination) SWMS 10370-4

Product SKU: 10370
Communications (Fibre Optic Termination) SWMS 10370-4 Video

Other Details

PDF Download:
communications_fibre_optic_termination_swms_10__37468_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Communications - Fibre Optic - Termination Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) provides guidance on Fibre Optic cable run in and termination. This SWMS covers the planning, preparation and operation and emergency procedures involved with running fibre optic cable into premises and terminating at a wall cabinet. 

Job Steps Covered in Communications - Fibre Optic - Termination SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Travel to/from sites
  4. Assess onsite conditions
  5. Work area set up
  6. Running cables/leads (ceiling spaces and walls)
  7. Attaching wall cabinets
  8. Cable termination
  9. Testing & Commissioning
  10. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...