Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Glass SWMS Pack 10

Glass SWMS Pack 10

Product SKU: 50157
Glass SWMS Pack 10 Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Glass SWMS Pack includes 8 ready-to-use SWMS templates
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Glass Safe Work Method Statement Pack

This Safe Work Method Statement (SWMS) pack contains 8 SWMS in total. Each SWMS contained within the Glass Safe Work Method Statement Pack includes a comprehensive outline of the job steps, general hazards and controls associated with working with glass such as cutting, transport and handling, installs that are performed from a height, plus more.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

The eight SWMS included in this pack are:

All SWMS in the Glass SWMS pack address:

  • High Risk Construction Work
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps
  • Potential Hazards
  • Control Measures
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

RRP:
$639.60
$440.00

PLUS GST

View Cart


You May Also Need...