Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

SWMS Template 30013-12

SWMS Template 30013-12

Product SKU: 30013
SWMS Template 30013-12 Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download Delivery
  • Easy to use and customise
  • Supplied in Microsoft Word 
  • Receive via email in 30 minutes or less!
  • Can be used for any SWMS development not just for work conducted on construction or roadside sites.

Safe Work Method Statement (SWMS) Template

The Safe Work Method Statement Template provides you with a tool for developing a task and site specific SWMS to suit your site activities. 

  • Includes a Risk Matrix
  • Supplied in MS Word - not PDF
  • Ready to use
  • Easy to complete 

Another great resource to use with this SWMS template is our OHS Legislation and Codes of Practice Reference List.

Write your own product review

Product Reviews


  1. SWMS template review

    Posted by on

    Finally a SWMS template that is of good quality, content and relative to current WHS legislation. It is flexible enough to adapt to any task or work being conducted with the ability to edit and input company logo. I found this excellent in producing a SWMS for a contractor who had nothing in place. However as with any Safe Work Method Statement the person drafting the document must have credible training in hazard /risk identification and be able to consult with the persons conduction the work for their input as well. score out of 1 to 5 with 5 being the highest I would rate this at 4.


$9.95

PLUS GST

View Cart


You May Also Need...