Need a customised SWMS package? Contact us for a free quote or call 1300 306 604
The Safe Work Method Statement Template provides you with a tool for developing a task and site specific SWMS to suit your site activities.
Posted by Mike on 22nd Apr 2013
Finally a SWMS template that is of good quality, content and relative to current WHS legislation. It is flexible enough to adapt to any task or work being conducted with the ability to edit and input company logo. I found this excellent in producing a SWMS for a contractor who had nothing in place. However as with any Safe Work Method Statement the person drafting the document must have credible training in hazard /risk identification and be able to consult with the persons conduction the work for their input as well. score out of 1 to 5 with 5 being the highest I would rate this at 4.