Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Concrete Floor Preparation SWMS 10619-2

Concrete Floor Preparation SWMS 10619-2

Product SKU: 10619
Concrete Floor Preparation SWMS 10619-2 Video

Other Details

PDF Download:
Concrete Floor Preparation SWMS 10619-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
 
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Concrete Floor Preparation Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the repair and preparation of concrete floors. This includes the use of floor grinder, jackhammer, patching methods and levelling compounds and exposure to Respirable Crystalline Silica (RCS) dust.

Job Steps Covered in Concrete Floor Preparation SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival onsite
  4. Work area set up
  5. Mechanical levelling using jackhammer &/or grinder
  6. Mixing and applying grouts/patching products & levelling compounds
  7. Applying patching &/or levelling compound 
  8. On Completion

Click here to view a sample of the Concrete Floor Preparation SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...