Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Concrete Formwork (Modular) SWMS 10611-2

Concrete Formwork (Modular) SWMS 10611-2

Product SKU: 10611
Concrete Formwork (Modular) SWMS 10611-2 Video

Other Details

PDF Download:
Concrete Formwork (modular) SWMS 10611-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Concrete Formwork (Modular) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with carrying out work that involves a modular system (e.g. Bondek) for Suspended Decks using traditional methods. This includes the delivery, storage, erecting and stripping decks. Also, included in this SWMS is the use of a welder and working at heights using a harness. 

Job Steps Covered in Concrete Formwork (Modular) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Modular System Design
  3. Training and Capabilities
  4. Arrival & Assess Onsite Conditions
  5. Work Area Setup
  6. False Decks
  7. Erecting Frames (including base plates and U heads)
  8. Installing Bearers and Joists
  9. Laying Deck
  10. Welding
  11. Concrete Pour
  12. Removing / Stripping Formwork Props & Braces (below deck and false deck)
  13. On Completion

Click here to view a sample of the Concrete Formwork (Modular) SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...