Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Concrete Kerb and Channel Installation SWMS 10311-3

Concrete Kerb and Channel Installation SWMS 10311-3

Product SKU: 10311-3
Concrete Kerb and Channel Installation SWMS 10311-3 Video

Other Details

PDF Download:
Concrete Kerb and Channel Installation SWMS 10311-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • Fully customisable so you can add your logo and any site specific details
  • Customising Instructions provided
  • You must have Microsoft Word or iAuditor to use this template

Concrete Kerb and Channel Installation Safe Work Method Statement

This pre-filled Safe Work Method Statement (SWMS) deals with general hazards associated with the installation of extruded concrete kerb and channel. This includes planning and preparation, training and use of a kerb and channel machine including refuelling.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Concrete Scanning SWMS Content: 

  • Hazardous Work
    • Mobile Plant
    • Work carried out adjacaent to a road, railway or shipping lane, traffic corridor
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Prepare work area
    • Delivery of equipment, kerb and channel machine
    • Setting out/profiling string lines
    • Preparing subgrade
    • Concrete extrusion
    • Refuelling machines
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...