Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Concrete (Saw - Core Drilling) SWMS 10067-7

Concrete (Saw - Core Drilling) SWMS 10067-7

Product SKU: 10067
Concrete (Saw - Core Drilling) SWMS 10067-7 Video

Other Details

PDF Download:
Concrete (saw core drilling) SWMS 10067-7_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided 
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Concrete (Saw Core Drilling) Safe Work Method Statement Scope:

This Safe Work Method Statement covers the general use of a hand held, electric or petrol/diesel powered concrete saw and core drill.  Included in this SWMS is planing and preparation, training and competency requirements and exposure to silica dust.

Job Steps Covered in Concrete (saw core drilling) SWMS:

  1. Planning & Preparation
  2. Training & Capabilities 
  3. Arrival & site assessment
  4. Work area set up
  5. Operarting the saw/drill
  6. Refuelling saw/drill on site
  7. On completion
  8. Record keeping/health monitoring

 

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...

 


Product Videos

Silica Exposure (02:01)
Download high quality version here: http://tinyurl.com/2fttz7eSilica is a common substance found in sand, rock, and building materials such as concrete and brick. Cutting, grinding, or drilling these materials releases dangerous crystalline silica dust into the air. This video shows how breathing in silica dust can cause permanent damage to the lungs.
  • Silica Exposure
    Download high quality version here: http://tinyurl.com/2fttz7e...