Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Concrete Slab (Waffle Pod Raft System) SWMS 10309-5

Concrete Slab (Waffle Pod Raft System) SWMS 10309-5

Product SKU: 10309
Concrete Slab (Waffle Pod Raft System) SWMS 10309-5 Video

Other Details

PDF Download:
concrete_slab_waffle_pod_raft_system_swms_10309-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Concrete Slab (waffle pod raft system) Safe Work Method Statement

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with handling, delivery and placement of wet concrete being placed into a waffle pod raft system.  This includes fill materials, steel reinforcement, edge formwork and concrete placement and finish.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

 

Concrete Slab (waffle pod raft system) SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor   
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • General Work area set up
    • Delivery of materials and mobile plant
    • Working near mobile plant
    • Setting out/profiling building lines
    • Preparing subgrade
    • Waffle pod placement
    • Setting steel reinforcement
    • Formwork
    • Placing concrete
    • Using Troweling machine while finishing concrete
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...