Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Concrete Slab (Waffle Pod Raft System) SWMS 10309-6

Concrete Slab (Waffle Pod Raft System) SWMS 10309-6

Product SKU: 10309
Concrete Slab (Waffle Pod Raft System) SWMS 10309-6 Video

Other Details

PDF Download:
Concrete Slab (waffle pod raft system) SWMS 10309-6_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Concrete Slab (waffle pod raft system) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) covers general aspects associated with handling, delivery and placement of wet concrete being placed into a waffle pod raft system. This includes fill materials, steel reinforcement, edge formwork and concrete placement and finish.

Job Steps Covered in Abrasive Blasting and Coating SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival & site assessment
  4. Work area set up
  5. Delivery of materials and mobile plant
  6. Working near mobile plant
  7. Setting out/profiling building lines
  8. Preparing subgrade
  9. Waffle pod placement
  10. Setting steel reinforcement
  11. Formwork
  12. Placing concrete
  13. Using Troweling machine while finishing concrete
  14. On Completion
  15. Record Keeping/ Health Monitoring

Click here to view a sample of the Concrete Slab (waffle pod raft system) SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...