Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Concrete (Steel Fixing) SWMS 10254-6

Concrete (Steel Fixing) SWMS 10254-6

Product SKU: 10254
Concrete (Steel Fixing) SWMS 10254-6 Video

Other Details

PDF Download:
Concrete (steel fixing) SWMS 10254-6_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Concrete Steel Fixing Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with guidance on steel fixing including setting and tying steel reinforcing bar for concrete construction.

Job Steps Covered in Concrete Steel Fixing SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival & Site Assessment 
  4. Work area setup
  5. Lifting steel 
  6. Setting steel
  7. Tying steel
  8. Cutting steel with grinder or a metal drop saw
  9. Electric and manual reinforcing bar cutters / benders
  10. Using oxyacetylene equipment
  11. On Completion

Click here to view a sample of the Concrete Steel Fixing SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...