Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Concrete Tilt-up (Lifting Panels) SWMS 10520-2

Concrete Tilt-up (Lifting Panels) SWMS 10520-2

Product SKU: 10520
Concrete Tilt-up (Lifting Panels) SWMS 10520-2 Video

Other Details

PDF Download:
Concrete Tilt-up (lifting panels) SWMS 10520-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Concrete Tilt-Up (lifting panels) Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards and controls associated with the general safety of work that involves the lifting and bracing of tilt-up/ precast concrete panels. This includes delivery of panels from off site and cast on site panels.

This SWMS does not cover crane operation or rigging. 

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.  

Concrete Tilt-Up (lifting panels) SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant
    • Tilt up or pre-cast concrete
    • Structures or buildings involving structural alterations or repairs that require temporary support to prevent collapse
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Establish temporary traffic control 
    • Set up of lifting / erection work area
    • Delivery of pre-cast panels
    • Crane placement
    • Establish a storage area for concrete element (if delivery from offsite)
    • Lifting panels
    • Lifting panel - crane use
    • Bracing
    • Removal of braces
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at. or works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...