Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Concrete Tilt-up (Lifting Panels) SWMS 10520-3

Concrete Tilt-up (Lifting Panels) SWMS 10520-3

Product SKU: 10520
Concrete Tilt-up (Lifting Panels) SWMS 10520-3 Video

Other Details

PDF Download:
Concrete Tilt-up (lifting panels) SWMS 10520-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
 
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Concrete Tilt-Up (Lifting Panels) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards and controls associated with the general safety of work that involves the lifting and bracing of tilt-up/ precast concrete panels. This includes delivery of panels from off site and cast on site panels.

This SWMS does not cover crane operation or rigging 

Job Steps Covered in Concrete Tilt-Up (Lifting Panels) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival & assess onsite conditions
  4. Establish temporary traffic control 
  5. Set up of lifting / erection work area
  6. Delivery of pre-cast panels
  7. Crane placement
  8. Establish a storage area for concrete element (if delivery from offsite)
  9. Lifting panels
  10. Lifting panel - crane use
  11. Bracing
  12. Removal of braces
  13. On Completion

Click here to view a sample of the Concrete Tilt-Up (Lifting Panels) SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...