Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Concrete - Tilt-up Panels - Night Work Attachment SWMS

Concrete - Tilt-up Panels - Night Work Attachment SWMS

Product SKU: 10400
Concrete - Tilt-up Panels - Night Work Attachment SWMS Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download Delivery
  • Provides a framework for training workers
  • Addresses generic risks and hazards
  • MS Word format allows you to make changes to the document
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks
  • Assists with compliance requirements for WHS inspections

This document is intended for use as an attachment to the Tilt Up Panels - Cast Off Site SWMS.

The Tilt Up Panels Night Work Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps for night work involving the transport to site and erection of Pre-cast Tilt Up concrete panels.

Follow the SWMS Tilt up panels (cast off site – single storey), in addition to this SWMS attachment for Night Work.

Main hazards:

-       Falling objects – being struck / crushed

-       Entrapment – crush injuries, death

-       Mobile plant – being run over / struck

-       Vehicle accident –  being run over / struck, or injuries from vehicle accident

-       Electricity – electric shock/electrocution

-       Slips, trips & falls – fractures, sprains, strains

-       Hazardous manual tasks – musculoskeletal disorders (MSD)

-       Noise – hearing loss

This SWMS includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Transporting
  • Operation
  • Emergency Procedures
  • Review
  • References

This SWMS is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

Product Details:

  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Review Date: 14 March 2014

Related items:

  • Manual Handling – Hazardous Manual Tasks
  • Tilt Up Panels – Cast Offsite
  • Tilt Up Panels – Cast Onsite

Product extract:

Additional Security personnel on site to ensure no unauthorised access by general public while work is being performed.

Additional temporary barriers near edges / steps / trenches etc. if the area is dark & worker may fall.

Mark edges of large equipment with fluoro tape if possible.

Keep work area tidy to minimise trip hazards. Keep access to work zones, stairways, walkways clear of tools and equipment.

If tools are dropped, they need to be picked up straight away to avoid workers from tripping or falling on them.

Panels need to be well lit prior to lifting/erecting and inspected to check for damage that may have occurred during transporting. Engineer to certify that the panels are ready to lift.

Use additional voice commands when required to ensure everyone knows when the lifting and installing sequence is underway.

On completion: All tools and equipment to be packed away and accounted for. Do not leave tools or equipment where people may be injured by it.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...