Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Concrete - Tilt-up Panels (Precast Panels) SWMS 10399-5

Concrete - Tilt-up Panels (Precast Panels) SWMS 10399-5

Product SKU: 10399
Concrete - Tilt-up Panels (Precast Panels) SWMS 10399-5 Video

Other Details

PDF Download:
Concrete Tilt-Up (precast panels) SWMS 10399-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
 
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Concrete - Tilt-up Panels (Precast Panels) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards and controls associated with the general safety of carrying out work that involves the casting of tilt-up / precast concrete panels. This includes formwork, steel fixing, concrete works and exposure to Respirable Crystalline Silica (RCS) dust. This SWMS does not cover the lifting of tilt-up / precast panels into place.

This SWMS does not cover the lifting of tilt-up / precast panels into place.  

Job Steps Covered in Concrete - Tilt-up Panels (Precast Panels) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Temporary Casting Bed-Design
  3. Concrete Panel Design
  4. Training and Capabilities
  5. Arrival & assess onsite conditions
  6. Work area set up
  7. Laying temporary casting beds
  8. Erecting formwork
  9. Powder actuated tools
  10. Applying bond breakers / release agents
  11. Setting steel reinforcement / lifting
  12. Tying steel reinforcement
  13. Placing and finishing concrete
  14. Removing / stripping formwork
  15. On Completion

Click here to view a sample of the Concrete - Tilt-up Panels (Precast Panels) SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...