Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Confined Spaces Rescue SWMS 10070-5

Confined Spaces Rescue SWMS 10070-5

Product SKU: 10070
Confined Spaces Rescue SWMS 10070-5 Video

Other Details

PDF Download:
onfined_space_rescue_swms_10__83388_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or SafetyCulture iAuditor to use this template

Confined Spaces Rescue Safe Work Method Statement

This Safe Work Method Statement (SWMS) outlines the general safety steps, hazards and controls associated with aspects of rescue operations in confined spaces. It does not provide detailed instructions for an actual rescue as circumstances will change in different situations.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Confined Spaces Rescue SWMS Content: 

  • High Risk Construction Work
    • Confined Spaces
    • Work in an area that may have contaminated or flammable atmospheres
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Equipment Inspections
    • Communication Protocols
    • Emergency Response
    • Hazardous Manual Handling
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


  1. Know the risks

    Posted by on

    Knowing the risks is more than half the battle; this SWMS outlines every possibility and gives sound advice on how to deal with all events. Written in 'friendly' language not only is the SWMS necessary to carry out the work but also gives peace of mind to our employees and supervisors.


$79.95

PLUS GST

View Cart


You May Also Need...