Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Construction Labourer SWMS 10556-3

Construction Labourer SWMS 10556-3

Product SKU: 10556
Construction Labourer SWMS 10556-3 Video

Other Details

PDF Download:
Construction Labourer SWMS 10556-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
 
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Construction Labourer Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the general safety issues concerned with a labourer working on construction sites.  

Job Steps Covered in Construction Labourer SWMS:

(includes potential hazards and control measures)

  1. Reporting to site supervisor - training and capabilities
  2. Working adjacent to powered mobile plant i.e. EWP, excavator etc
  3. Manual handling - pushing, pulling, lifting, carrying, setting down
  4. Operating power tools
  5. Working at elevated levels
  6. Working with hand tools
  7. Wheelbarrow use
  8. Refuelling small engine equipment on site
  9. On Completion

Click here to view a sample of the Construction Labourer SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...