Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Cool Room Construction SWMS 10599-2

Cool Room Construction SWMS 10599-2

Product SKU: 10599
Cool Room Construction SWMS 10599-2 Video

Other Details

PDF Download:
cool_room_construction_swms_10599-1__55952_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Cool Room Construction Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) provides an outlines of the general safety steps, hazards and controls relating to construction of cool/freezer rooms using insulated panelling. Included in this SWMS is planning and preparation, manual handling considerations, working on platform ladders and trestles, working near EWP, cutting and joining insulated panel products and use of mastic sealants.

Job Steps Covered in Cool Room Construction SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Materials delivery and placement
  5. Work area set up
  6. Cutting / trimming / joining panels & angle lengths
  7. Using Caulking products/gun
  8. Positioning & levelling base panels 
  9. Standing wall panels & installing roof panels
  10. Working at elevated positions 
  11. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...