Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Crane (Tower) Operation SWMS 10272-5

Crane (Tower) Operation SWMS 10272-5

Product SKU: 10272-5
Crane (Tower) Operation SWMS 10272-5 Video

Other Details

PDF Download:
crane_tower_operation_swms_10__03252_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Crane - Tower Operation Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining risk management processes and procedures associated with operation of a Tower Crane with a manned cabin.

This SWMS does not cover the transportation, erection or dismantling of the tower crane.

Job Steps Covered in Crane - Tower Operation SWMS: 

 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival & assess onsite conditions
  4. Climbing the tower
  5. Pre-inspect crane
  6. Establish a communication system
  7. Pre lift assessment
  8. Crane operation
  9. Refuelling
  10. On completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...