Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Crane (Overhead – Bridge - Gantry) SWMS 10177-6

Crane (Overhead – Bridge - Gantry) SWMS 10177-6

Product SKU: 10177
Crane (Overhead – Bridge - Gantry) SWMS 10177-6 Video

Other Details

PDF Download:
crane_overhead_-_bridge_-_gantry_swms_10__08880_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Crane (Overhead – Bridge - Gantry) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document covering the risk management processes and procedures associated with operation of a Bridge or Gantry Crane with both a manned cabin and remote controlled.  

This SWMS does not cover the transportation, erection or dismantling of a Gantry or Bridge Crane.

Job Steps Covered in Crane (Overhead – Bridge - Gantry) SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Climbing the crane
  5. Crane Pre start check
  6. Select and inspect equipment
  7. Establish a communication system
  8. Pre lift assessment
  9. Crane operation
  10. Maintenance work on crane
  11. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...