Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Crane (Truck Mounted) SWMS 10133-4

Crane (Truck Mounted) SWMS 10133-4

Product SKU: 10133
Crane (Truck Mounted) SWMS 10133-4 Video

Other Details

PDF Download:
crane_truck_mounted_swms_10__52517_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Crane (Truck Mounted) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the use of a truck-mounted crane such as a Hiab. This SWMS includes a Crane Truck prestart checklist.

Job Steps Covered in Crane (Truck Mounted) SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Road operation to/from/between sites
  4. Assess onsite conditions
  5. Site setup loading / unloading
  6. Establish a communication system with ground workers
  7. Crane pre start check
  8. Select and inspect equipment
  9. Pre lift assessment
  10. Loading / Unloading trucks
  11. Changing lift attachments
  12. Refuelling
  13. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


  1. Truck Mounted Crane

    Posted by on

    Very happy with the customer service I received. The document met all our needs.


  2. Truck Mounted Crane

    Posted by on

    Very happy with customer service received and more importantly the document ticked all the boxes required to be worksafe compliant


$79.95

PLUS GST

View Cart


You May Also Need...