Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Decoration Installation SWMS 10463-2

Decoration Installation SWMS 10463-2

Product SKU: 10463
Decoration Installation SWMS 10463-2 Video

Other Details

PDF Download:
decoration_installation_swms_10463-2__80045_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Decoration Installation Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the installation of decorations (including Christmas tree, lights, tinsel, baubles, banners etc.) at shopping centres and other outdoor public venues. This SWMS includes the use of ladder and the safe operation of Elevated Work Platforms including scissor lifts, boom lifts and cherry pickers. Falls Emergency Rescue Plan included.

Job Steps Covered in Decoration Installation SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Travel to, from & between sites
  4. Loading / unloading decorations/ equipment
  5. Delivery and removal of EWP
  6. Arrival & set-up onsite 
  7. Installing decorations
  8. Refuelling EWP on site
  9. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...