Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Demolition (Soft) SWMS 10367-6

Demolition (Soft) SWMS 10367-6

Product SKU: 10367
Demolition (Soft) SWMS 10367-6 Video

Other Details

PDF Download:
Demolition (soft) SWMS 10367-6_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Demolition (Soft) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) covers the strip-out of existing premises in preparation for demolishing a structure or refurbishment. Included in this SWMS is planning and preparation, training and competency requirements, and exposure to Respirable Crystalline Silica (RCS) dust.

Job Steps Covered in Demolition (Soft) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival onsite
  4. Work area set up
  5. Remove items – i.e. furnishings, cabinets, rugs, appliances, partitions etc
  6. Carpet / vinyl removal 
  7. Glass / window removal
  8. Removal ceiling fittings, ceiling panels, non-structural walls, timbers etc.
  9. Tile, concrete flooring removal
  10. On Completion
  11. Record Keeping/ Health Monitoring

Click here to view a sample of the Demolition (Soft) SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png 

 

 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...