Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Dogman SWMS 10338-4

Dogman SWMS 10338-4

Product SKU: 10338
Dogman SWMS 10338-4 Video

Other Details

PDF Download:
dogman_swms_10__41688_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Dogging - Dogman Safe Work Method Statement Scope:

The Dogging Safe Work Method Statement (SWMS) is a comprehensive document which covers the risk management processes and procedures associated with basic rigging and dogman work relating to the slinging, direction and move of loads on a crane. 

Job Steps Covered in Dogging - Dogman SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess on-site conditions
  4. Prepare work area
  5. Select and inspect material and tools
  6. Pre lift Assessment 
  7. Undertake dogging task
  8. Working in an elevated position
  9. On completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...